AMENDED AGENDA
OLD LYME INLAND WETLANDS AND WATERCOURSES COMMISSION
REGULAR MEETING, TUESDAY, OCTOBER 23, 2007,
7:30 PM AT CHRIST THE KING CHURCH MEETING ROOMS
1 MC CURDY ROAD
OLD LYME, CT
Call to order.
Minutes of previous meeting dated September 25, 2007.
Minutes of site walk dated October 13, 2007
Minutes of site walk dated September 24, 2007
NEW BUSINESS
#07-42 Application of Old Lyme Country Club at 35 McCurdy Road, Fill in approximately 3,359 sq. ft. of wetlands, construct a 45 space gravel parking lot and install paddle tennis courts and a 24’ x 24’ shed/warming hut.
#07-43 Application of Douglas Andrews, 29 Boston Post Road, Construction of a garage.
#07-44 Application of Corey & Kristin Bullock, 30 Champlain Drive, Construction of an addition and garage.
#07-45 Application of Bedri Babasuli, 20 Grassy Road – Proposed Driveway Construction to provide off road parking and septic system repair.
#07-46 Application of Michael & Anna Switzer – 5 Gould Lane – Addition to structure including screen porch.
OLD BUSINESS
#07-31 Application of Timothy Londregan at 3 Huntley Road – Construction of an office building.
#07-38 – Application of Bedri Babasuci, 20 Grassy Hill Road, Repair existing retaining wall along Rogers Lake and to extend the wall along the entire frontage of the lake.
#07-39 – Application of Fran and Colleen Sablone, 68 Grassy Hill Road, Construct a concrete retaining wall along the lake front.
#07-40 – Application of Lesley Chick, 66 Grassy Hill Road, Construct a concrete retaining wall along the lake front.
#07-41 – Application of Erik Block at 4 Rose Lane, Construction of an addition.
VIOLATIONS:
1. Lords Woods Subdivision, clearing beyond the approved limits and modification to the road design. Cease and Desist Order: Mitigation proposal to be discussed.
2. Enforcement Report
ADJOURNMENT
|